, de la F. G. J. P. M. (2001) “Admissible time interval between layers in theconstruction of roller compacted concrete (RCC) dams”, Hormigón y Acero, 52(222). Available at: http://www.hormigonyacero.com/index.php/ache/article/view/307 (Accessed: 18May2024).