Eilzer, Wolfgang, Michael Müller, Marc Schumm, Martin Romberg, Rafael Rodríguez Molina, and Fernando Gutiérrez Manzanedo. 2022. “Replacement of the Cable-Stayed Bridges over the River Rhine in Leverkusen and Duisburg”. Hormigón Y Acero 73 (297): 23-30. https://doi.org/10.33586/hya.2020.2390.