Pacheco, Pedro, et al. “Construction of 90m Span Bridge Decks With Movable Scaffolding Systems: A Practical Case”. Hormigón Y Acero, vol. 76, no. 305, Apr. 2025, pp. 139-46, https://doi.org/10.33586/hya.2020.2996.