1.
Eilzer W, Müller M, Schumm M, Romberg M, Rodríguez Molina R, Gutiérrez Manzanedo F. Replacement of the cable-stayed bridges over the river Rhine in Leverkusen and Duisburg. hya [Internet]. 2022 Aug. 31 [cited 2026 Nov. 23];73(297):23-30. Available from: https://www.hormigonyacero.com/index.php/ache/article/view/2390