Bridge Over the Danube River at Bratislava (Motorway D4). East Approach Bridge, Built up Span by Span Using a Movable Scaffolding System

Authors

  • José M Simón-Talero Muñoz
  • Ramón Mª Merino Martínez
  • Ángel Carriazo Lara 6242703C
  • Javier Domínguez Martínez
  • David Walias Sánchez
  • Wojciech Wlodzimirski
  • Luis Martín-Tereso López

DOI:

https://doi.org/10.33586/hya.2020.2761

Keywords:

prestrressed concrete, box girder, overhangs, span by span, movable scaffolding system

Abstract

East Approach viaduct to the bridge over the Danube river is a continuous prestressed concrete bridge, 1250.5m long and 35m wide. The bridge typical section is built up in two phases, using a movable scaffolding system and a wing traveler. A detailed study of the non-linear stress distribution on the deck typical section has been useful to optimize the prestressing steel quantification, in order to define a single internal bonded post- tensioning tendon system, not being necessary to design an extra external prestressing system inside the deck box core, as usual in other comparable recent realizations.

Downloads

Published

2025-04-28

How to Cite

Simón-Talero Muñoz, J. M., Merino Martínez, R. M., Carriazo Lara, Á., Domínguez Martínez, J., Walias Sánchez, D., Wlodzimirski, W., & Martín-Tereso López, L. (2025). Bridge Over the Danube River at Bratislava (Motorway D4). East Approach Bridge, Built up Span by Span Using a Movable Scaffolding System. Hormigón Y Acero, 76(305), 83-90. https://doi.org/10.33586/hya.2020.2761