Renovation of the Santiago Bernabéu Stadium. Project Management, Site Supervision Organization

Authors

  • Rafael Sanchez Ripio
  • Carlos López Palanco Díaz

DOI:

https://doi.org/10.33586/hya.2025.4021

Keywords:

Renovation, Santiago Bernabeu, Project management, supervision, build while operate

Abstract

The Santiago Bernabéu stadium renovation project, located in the main street Paseo de la Castellana of Madrid, posed a significant challenge in terms of engineering, construction, and management. It was carried out under a Design and Build contract using a fast-track model, which demanded high coordination and performance from all teams involved.

The challenge was heightened by the need to keep the stadium operational for sports events over five football championship seasons while optimizing the business model through commercial occupancy. Project Management, Design Review, and Site Supervision teams worked to meet strict deadlines, ensuring safety, weekly stadium use in compliance with regulations, and comfort for both club members and visitors, thereby strengthening the Real Madrid brand.

Author Biography

  • Rafael Sanchez Ripio

    Industrial Engineer. Project managment tam leader. Bovis from CBRE

Downloads

Published

2025-11-13

Issue

Section

Monog. Estadio Santiago Bernabéu

How to Cite

Sanchez Ripio, R., & López Palanco Díaz, C. (2025). Renovation of the Santiago Bernabéu Stadium. Project Management, Site Supervision Organization. Hormigón Y Acero, 76(307), 317-325. https://doi.org/10.33586/hya.2025.4021