The Sabiñánigo Viaduct on the A-23 Highway. Conception, Project and Erection

Authors

  • Miguel Ortega
  • Fernando Ruano Parra
  • Jokin Ugarte González TYLin
  • Alberto Suz
  • Jesús Martín
  • Juan Luis Mansilla
  • David Alcáñiz

DOI:

https://doi.org/10.33586/hya.2026.4213

Keywords:

Post-tensioned bridge, evolutionary construction, movable-scaffolding-system, wing traveler

Abstract

The Sabiñánigo Viaduct over the Gállego and Aurín rivers on the A-23 highrway is a structure 933.70 m long and 25.10 m wide, with a span distribution of 9x90+74+49.7. The deck consists of a prestressed concrete box girder 9 m wide at the top and large lateral cantilevers supported by prefabricated struts every 5 m. The depth of the deck varies from a minimum of 3.20 m (L/28.12) in the midspan to a maximum of 5.50 m above piers (L/16.36). Its most notable feature is the 90 m typical span, in which the central box girder is constructed using a Movable Scaffolding System (MSS), which is the world record for the longest span constructed using this method (shared with a viaduct on the Ankara-Istanbul railway line). The large cantilevers are concreted in a second phase using a wing traveler.

The design of the deck is based on a compromise between structural efficiency, provided by the variation in depth, and construction efficiency, achieved by the 50 m central section of constant depth and a relatively narrow box girder, which allows for the standardisation of construction processes and minimise the weight of the deck.

Downloads

Published

2026-09-03

Issue

Section

Articles

How to Cite

Ortega, M., Ruano Parra, F., Ugarte González, J., Suz, A., Martín, J., Mansilla, J. L., & Alcáñiz, D. (2026). The Sabiñánigo Viaduct on the A-23 Highway. Conception, Project and Erection. Hormigón Y Acero. https://doi.org/10.33586/hya.2026.4213