Construction of piers and deck over the arch at the Almonte Viaduct

Authors

  • Agustín Alonso
  • David Carnero
  • José Luis del Valle
  • Pedro Cavero

DOI:

https://doi.org/10.33586/hya.2019.2059

Keywords:

piers over arch, overhead movable scaffolding system, asymmetric construction sequence, anti-bird strike, tubular screen, loading test

Abstract

After the arch closure and the dismantling of the temporary stay system, including the steel king tower, the bridge construction continues with the piers and the deck over the arch. Each pair of opposite spans are poured asymmetrically utilizing two overhead movable scaffolding systems. The last section is the center span, which becomes the deck’s fixed point for longitudinal displacements. Finally, the deck non-structural elements are installed and load testing per bridge code requirements is performed.

Additional Files

Published

2015-04-20

Issue

Section

Almonte Viaduct Monographic

How to Cite

Alonso, A., Carnero, D., del Valle, J. L., & Cavero, P. (2015). Construction of piers and deck over the arch at the Almonte Viaduct. Hormigón Y Acero, 71(290-291), 131-150. https://doi.org/10.33586/hya.2019.2059