Abstract

.

The construction of a bridge like Almonte Viaduct needs a specific detailed design to fit the design to the construction process and to design the temporary works. The collaboration between the designers and the construction team has been essential in the development of this work.

Downloads

Published

2015-04-20

Issue

Section

Almonte Viaduct Monographic

How to Cite

Arribas Mazarracín, D., Bernal Sahún, P., González Esteban, J. I., & Pérez Casas, J. M. (2015). Detailed design of the Almonte viaduct. Hormigón Y Acero, 71(290-291), 43-67. https://doi.org/10.33586/hya.2019.2063