Renovation of the Santiago Bernabéu Stadium. Architectural Project Development

Authors

  • Gema Martínez González-Valcarcel arquitecta
  • Manuel Bernabé Martín arquitecto TYPSA

DOI:

https://doi.org/10.33586/hya.2025.3991

Keywords:

coordination, architectura, galery, skywalk, joints

Abstract

The project of the built-up stadium starts from an initial project definition 1 on which a variant is made in the bidding phase that, while preserving the volumetry and all the functional and compositional characteristics of the design, introduces modifications in the structural concept in order to make it compatible with the proposed time frame and conditions of use.

In the development of the subsequent project, situations arise that go beyond the known casuistry in buildings of a usual urban scale: there are no precedents and it is necessary to create new solutions, demanding from all disciplines their maximum capacity for analysis and their collaboration to intervene in a creative dialogue that ends in a concrete, executable, safe proposal that is faithful to the initial spirit of the project.

This article describes some of these situations in which the line separating architecture and structure is difficult to define and which were tackled and resolved with a coordinated effort between architects and engineers: new access towers B and C, pendulum fittings in circulation spaces, joints from the museum to the stadium, the technical gallery, the trolley tunnel, folding bleachers, and skywalk transition zones.

Downloads

Published

2025-11-13

Issue

Section

Monog. Estadio Santiago Bernabéu

How to Cite

Martínez González-Valcarcel, G., & Bernabé Martín, M. (2025). Renovation of the Santiago Bernabéu Stadium. Architectural Project Development. Hormigón Y Acero, 76(307), 33-54. https://doi.org/10.33586/hya.2025.3991